Another creation of then Parrikar Govt. in 2004
Amona Bridge:
The bridge between Amona in Bicholim and Khandola in Ponda taluka was informally thrown open to pedestrians movement on 09 December, 2004, for the Amona Zatra.
Before the bridge, Ferry service was available here between Khandola - Amona the same (Ferry Service) was withdrawn in around 9th March 2005, which means the bridge was thrown open or inaugurated around same time early March 2005
Bridge in Structural Steel Superstructure with total length of 510 mtrs. with spans of 65 mtrs., 50 mtrs. and 30mtrs.
Estimated Cost: Rs 27.0 Crores. Client : Public Works Department, Goa. Another about 2.5 crores were spent on its maintenance (Structure) around 2017/2018
Amona Steel Bridge
under the bridge
after 5pm
A view from the bridge
http://www.flickr.com/photos/joegoauk59/8066210409/sizes/l/in/photostream/
Some pics taken 17 February 2016
https://www.flickr.com/photos/joegoauk73/25096543825/in/photostream/
pics from 2006
http://www.flickr.com/photos/joegoauksix/236247577/sizes/z/in/photostream/
http://www.flickr.com/photos/joegoauk4/234650130/sizes/l/in/photostream/
Some pics taken 17 February 2016
https://www.flickr.com/photos/joegoauk73/25096543825/in/photostream/
pics from 2006
http://www.flickr.com/photos/joegoauksix/236247577/sizes/z/in/photostream/
http://www.flickr.com/photos/joegoauk4/234650130/sizes/l/in/photostream/
Video 1 (under the bridge) http://www.youtube.com/watch?v=TvuWEjDtPd4
Video 2 The bridge http://www.youtube.com/watch?v=Wd8jHZmAUds
No comments:
Post a Comment